FSU Tenaga 1 & 2 – Steam Expansion Bellows for Gas Heaters
Project Type
Marine gas heater system: steam expansion bellow design, supply and installation.
Industry
Marine / Floating Storage Units / Gas Handling
Project Requirements
REESB recorded two project awards for steam expansion bellows used in gas heater applications: FSU Tenaga 1 in April 2025 and FSU Tenaga 2 in June 2025, both associated with Melaka and MISC Maritime Services. Each recorded scope covered design, supply and installation.
Engineering Challenge
Steam expansion bellows in gas heater piping applications require suitable engineering for the specified service and installation interfaces.
Engineering Solutions
REESB provided design, supply and installation services for steam expansion bellows for both FSU Tenaga 1 and FSU Tenaga 2. These projects demonstrate REESB’s service offering for marine-related steam and gas heater applications.
Project Outcome
The 2025 project history records two separate FSU gas heater steam expansion bellow scopes, each including design, supply and installation.
Images During The Project

